The mats were delivered today while I was running wiring. Tomorrow a rug gets installed in the viewing room and a tile floor in the front bathroom. Once that’s done, the bathroom can be finished (toilet finally moved — see post below) and floor molding installed. Also tomorrow or soon thereafter the outside signage will be installed. Then the cleaning …
Bad Toilet Placement
We’ve asked them to move the toilet as we feel this leaves the user too exposed.
A Rendition
This is a rendition of the dojo with a perspective from out on the training floor.
New Dojo – “Before” Pictures
We are pleased to announce we are opening a new training facility in Monroe, Connecticut very close to where we currently train. The facility is located on route 111 (Monroe Tnpk) just 4 miles down the road from Trumbull Town Hall. It is next to Monroe Elementary School in the Village Square Shopping Center along with St. Vincent’s Immediate Health …